Goeweil plant Rainbach

Project data

Construction time: 04/2020 - 12/2020

Contractor: SCHMID

Produktion-hall
1200 Tons

Versatility in high quality

To speed up the installation times, BEST supplied a wide range of reinforcement elements for the Göweil plant in Rainbach, which were layed by trained in-house personnel.

The full range of high-quality BEST products and services was used.

The Göweil construction project was a total order from BEST. BEST's services included the timely, norm-compliant, and punctual production, delivery, and laying of construction steel. The total tonnage of approximately 1200 tons was divided into approximately 630 tons of reinforcement steel, 420 tons of construction steel mesh, 70 tons of welded elements, and 80 tons of prefabricated reinforcement cages.

The office and foundation of the production hall for the industrial building were conventionally produced with loose reinforcement. Prefabricated welded elements were used for the floor slabs. In addition, columns produced in a precast plant were partially knitted and partially fix-welded.

Through years of diverse prefabrication know-how, sophisticated control systems, and dedicated personnel, this order was handled with optimal added value.